Monday 14 April 2014

Piling at various sites

Augured piling at Gatacre Avenue, holes been drilled 16m into the ground and filled with reinforced concrete:


 Pre Cast piles delivery to Swan Lane to be driven 12m into ground: 



Piling completed at Swan Lane:


Piles been prepared ready for concrete pile caps:


Concreting of pile caps at Sefton place with use of concrete pump:


 Installation of  Pre Cast foundations ready for plot drainage and commencing substructure brickwork


Site Clearance

Site clearance at Swan Lane, grubbing up of existing foundations and demolition of remaining structures ready for crushing, to be re-used on site.



Ground been levelled and compacted ready for piling rigs: